In its alloy steel chain paragraph, 1926.251(b)(3), OSHA's construction rigging rule bars job or shop hooks and links and makeshift fasteners formed from bolts, rods or similar attachments; 1910.184(e)(2) has the matching general industry ban for alloy chain slings.

A link bent up from threaded rod has no known rating, no traceable material and no maker standing behind it, and testing it afterward does not fix that. The same thinking runs through several other rules:

  • Fiber rope eye splices follow the rope maker's instructions, and a knot never replaces a splice.
  • U-bolt wire rope clips put the U on the dead end and the saddle on the live end, with the number and spacing taken from the OSHA table for that rope size.
  • Slings are never shortened with knots, bolts or makeshift devices; use a rated shortening fitting or a shorter sling.
  • Special custom-design grabs, hooks and clamps are marked with their safe working load and proof tested to 125 percent of it before use.

Example: a one-off clamp rated 5 tons is proof tested at 5 x 1.25 = 6.25 tons before its first lift. A test at the weight of the actual load is not enough.

Check yourself

1. U-bolt wire rope clips are used to form a termination in wire rope. How must the clips be applied?

2. A crew needs a connecting link and a worker offers one bent up from threaded rod in the shop. Under OSHA 29 CFR 1926.251, what must the crew do?

Facts checked 2026-11-15 · Sources: OSHA 29 CFR 1926.251: Rigging equipment for material handling, OSHA 29 CFR 1910.184: Slings, OSHA 29 CFR 1926.1431: Hoisting personnel