← Load Control & Completing the Lift

Chapter 7 · Lesson 5 of 5

Landing the load and finishing the lift

1 min read

Blocking has two jobs: it must carry the load without crushing or letting it tip, and it must hold the load high enough, in the right places, that the slings come out by hand. Blocking set directly under the sling contact points traps the slings.

Before the slings are slackened, the load must rest stable on its supports and be blocked, cribbed or chocked so it cannot tip or roll; a tall or round load can look steady while the slings hold it and topple the moment they go slack.

If a sling ends up trapped, it is never pulled out from under the resting load, by hand or by the hoist; the load is jacked, cribbed or rolled off it first, and no one reaches under a suspended load to drag rigging clear.

A sling that is too long for the pick is not shortened with a knot, bolt or twist; choose a shorter sling.

Example: a crew sets a 4 ft tall cabinet on two 4 by 4 timbers placed inside the sling positions; the cabinet stands steady and both slings slide out freely. When the lift is done, slings and hardware are cleaned and stored dry on racks, off the ground, with any damaged gear tagged out.

Check yourself

1. A load is being set down on a concrete floor. How should the blocking under it be arranged?

2. Before the slings are slackened and taken off, what condition must the landed load meet?