Who inspects slings, and how often

1 min read

The timing rules are tied to use, not to the calendar. On construction work, OSHA 1926.251 requires rigging to be inspected prior to use on each shift and as necessary during use.

For slings, both 1926.251 and the general industry rule, OSHA 1910.184, also have a competent person designated by the employer inspect each sling and its fastenings each day before use, with more checks during use when conditions call for it. Many flashcards say qualified person for the OSHA daily check; the regulation says competent person.

ASME B30.9 uses two levels. The frequent inspection is a visual check each shift before use by a designated person, and it needs no written record so it is never skipped for paperwork. The periodic inspection is a more thorough one, and a written record of the most recent one is kept.

ASME also splits the roles: the designated person finds and reports a condition, and a qualified person decides whether it is a hazard and whether the sling may return to service. Reducing the load or passing a field pull never cancels a listed removal condition.

Check yourself

1. A designated person inspecting a sling under ASME B30.9 finds a deficiency. Who decides whether that sling may go back into service?

2. A rigger finds a condition on a sling that requires removal from service. What must physically happen to that sling?

Facts checked 2026-11-15 · Sources: OSHA 29 CFR 1910.184: Slings, OSHA 29 CFR 1926.251: Rigging equipment for material handling, NCCCO: Rigger Level I written exam outline