Chapters0/29 ▾
Chapter 1 · Lesson 3 of 5
Lockout/tagout, machine guarding and electrical hazards
1 min read
The OSHA standard for the control of hazardous energy sets the order for locking out a machine before servicing: notify affected employees, shut the machine down, isolate every energy source, apply each authorized worker's personal lock and tag, release or block stored energy, then verify zero energy by trying the controls and returning them to off.
Stored energy is the step candidates forget: springs, hydraulic and air pressure, capacitors and raised parts can still move after the supply is cut.
- The authorized employee locks out and does the servicing; the affected employee, such as the machine's regular operator, is notified before and after.
- In group lockout each worker puts a personal lock on a group hasp and removes only that lock, so nobody is released from protection by someone else.
- A missing point-of-operation guard means stop the job, keep the machine out of use and tell the supervisor; slowing down or standing back does not control an amputation hazard.
- An arc-flash boundary on a panel label marks the distance inside which an arcing fault could cause serious burns without arc-rated PPE.
Check yourself
1. Three workers will service the same conveyor during one shift. How should the locks be handled?
2. A technician has notified affected employees, shut the machine down, isolated its energy sources, and applied a personal lock and tag. What must happen next?
Facts checked 2026-11-15 · Sources: MSSC: Certified Production Technician (CPT 4.0), OSHA 29 CFR 1910.147: The control of hazardous energy (lockout/tagout), OSHA: Hazard Communication
Production Technician cheat sheet: every key fact on one page →