Quibank app: now on the App Store — free, works offline. Get the app ↗

Chapters0/29 ▾
  1. 1.Safety0/5
    1. Worker rights, employer duties and reporting hazards
    2. The hierarchy of controls and personal protective equipment
    3. Lockout/tagout, machine guarding and electrical hazards
    4. Hazard communication, chemical storage and fire
    5. Confined spaces and ergonomics
  2. 2.Quality Practices & Inspection0/4
    1. Quality systems, audits and the internal customer
    2. Prevention versus detection: cost of quality and inspection points
    3. Control charts and variation
    4. Root cause tools, nonconforming product and corrective action
  3. 3.Measurement & Blueprint Reading0/5
    1. Choosing and reading micrometers and calipers
    2. Indicators, transfer gauges and go/no-go gauges
    3. Calibration and conditions that affect accuracy
    4. Reading the print: views, lines, scale and the title block
    5. Limits, tolerance, allowance and GD&T basics
  4. 4.Manufacturing Processes & Materials0/5
    1. How parts are shaped: casting, molding, forging, machining and additive
    2. Joining, heat treating and finishing
    3. Materials and their properties
    4. Volume, setup cost, takt time and the bottleneck
    5. Work orders, travelers, traceability and connected machines
  5. 5.Lean & Continuous Improvement0/5
    1. Value-added, non-value-added and necessary work
    2. The eight wastes
    3. 5S, visual management and the andon
    4. Standard work, kaizen and plan-do-check-act
    5. Pull, value stream maps, quick changeover and poka-yoke
  6. 6.Maintenance Awareness0/5
    1. Reactive, preventive and predictive maintenance, and TPM
    2. PM discipline, maintenance records and warning signs
    3. Lockout/tagout and stored energy
    4. Lubrication, bearings and shaft alignment
    5. Belts, chains, motor overloads and fluid power
Saved in this browser. Move it to another device →
← Quality Practices & Inspection

Chapter 2 · Lesson 3 of 4

Control charts and variation

1 min read

A control chart plots a process measurement in time order against a center line and upper and lower control limits, so the operator can see whether the process is behaving normally or something has changed.

Every process has common cause variation, the small random spread built into the process; when only that is present the process is in statistical control, and reducing it usually takes an engineering or management change.

Special or assignable cause variation comes from an unusual event, such as a new material lot, a worn tool, a setup change or a measurement problem, and it can be found and removed.

  • A point beyond a control limit is a signal: first find what changed at that time, rather than erasing the point or resetting the machine after one reading.
  • A long run of points on one side of the center line also signals that the average has probably shifted, even if no point crossed a limit.
  • Control limits are calculated from the process, normally three sigma from its own average; specification limits are the customer or drawing requirement and are never drawn in their place.

Check yourself

1. A single point falls outside the upper control limit on the operator's chart. What should the operator do first?

2. Small, random variation that is always present in a stable process is called ___.

Facts checked 2026-11-15 · Sources: MSSC: Certified Production Technician (CPT 4.0), NIST/SEMATECH e-Handbook of Statistical Methods: Introduction to control charts

Production Technician cheat sheet: every key fact on one page →