Chapters0/29 ▾
Chapter 4 · Lesson 5 of 5
Work orders, travelers, traceability and connected machines
1 min read
Every job runs on paperwork, and the exam checks that you know which document does what. The routing sheet, often called a traveler, moves with the job and lists each operation in order with its work center and sign-off. The bill of material lists components and quantities. Packing slips and invoices belong to shipping and billing.
- Before a job runs, the material must match the part number, specification and revision on the work order. If it does not, stop and tell the supervisor; never edit the paperwork or swap in look-alike stock.
- Shelf-life stock is issued first in, first out, so the oldest acceptable material is used before it expires.
- In a pull system, a kanban signal from the next process, not a forecast, tells a station to make more.
- A lot number scanned at each step links every unit to its material, machine and operators, so a later problem can be contained to exactly the units involved.
Industry 4.0 questions test concepts. Augmented reality lays digital information, such as the next step or a part number, over the real workspace, while virtual reality replaces the view with a simulation, which suits off-line training.
Machines that stream vibration and temperature data let a rising trend be caught before failure. Data never removes the duty to keep records, follow start-up procedures, or keep guards closed.
Check yourself
1. Which document moves with the job through the plant and lists, in order, the operations the part must go through?
2. Every carton carries a lot number that is scanned at each operation. What does this practice mainly give the plant?
Facts checked 2026-11-15 · Sources: MSSC: Certified Production Technician (CPT 4.0)
Production Technician cheat sheet: every key fact on one page →