Lean names eight kinds of waste. Many trainers remember them as DOWNTIME: Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory (excess), Motion and Extra-processing. Exam stems describe one in plain words, so learn the key difference for each pair that is easy to confuse.
- Motion versus transportation: motion is the person moving unnecessarily, such as walking to a shared tool cart for every part; transportation is the material moving, such as forklifting totes across the plant.
- Extra-processing versus defects: extra-processing is doing more than the print asks, such as polishing finer than required; a defect is a part that fails the print and needs rework.
- Non-utilized talent: operators' ideas are never collected, answered or tried.
Overproduction, making more, sooner or faster than the next process needs, is called the worst waste because it causes the others: extra inventory, handling, storage, waiting and paperwork, and it hides defects until a whole batch is made.
Example: a press runs a full extra rack of brackets to stay busy; now the rack needs floor space, a forklift move and counting, and a bad die would not be noticed until all of it is checked.
Check yourself
1. Overproduction is traditionally called the worst of the eight wastes. Why?
2. Totes of work-in-process are hauled by forklift across the plant to the next operation three times a shift. Which waste is this?
Facts checked 2026-11-15 · Sources: MSSC: Certified Production Technician (CPT 4.0)