Chapters0/29 ▾
Chapter 5 · Lesson 5 of 5
Pull, value stream maps, quick changeover and poka-yoke
1 min read
In a pull system, nothing is made until the next process uses something. A kanban card coming back to a cell authorizes making exactly the quantity just consumed, no more.
Where two processes cannot flow directly, a supermarket holds a small, controlled stock at a marked location; the downstream process withdraws what it needs, and that withdrawal is the signal to replace it. The fixed maximum keeps it from becoming ordinary excess inventory.
A value stream map follows one product family door to door and draws both the material flow and the information flow, with cycle times, changeover times and the inventory between steps, which shows where waiting piles up. Quick changeover attacks one cause of big batches.
Example: if a cell can spare 100 minutes a day for setups, a 50-minute changeover allows 2 product switches, while a 10-minute changeover allows 10, so batches shrink and lead time falls.
Poka-yoke, or error-proofing, changes the equipment or method so a mistake cannot be made or cannot pass undetected, such as a fixture that will not close on a part loaded backwards. Inspectors, defect charts and rework benches all act after the error.
That is why the exam treats preventing an error as cheaper and more reliable than detecting it. A person checking parts can miss one; a fixture that refuses a backwards part cannot.
Check yourself
1. In a pull system, what is a supermarket?
2. Which of these is a poka-yoke (error-proofing device)?
Facts checked 2026-11-15 · Sources: MSSC: Certified Production Technician (CPT 4.0)
Production Technician cheat sheet: every key fact on one page →