5S, visual management and the andon
1 min read
5S organizes a work area in a fixed order, and the order itself is tested. Sort comes first so the team does not waste effort arranging or cleaning items that should not be there.
- Sort: remove tools, stock, fixtures and paperwork the area does not need.
- Set in Order: give everything left a marked home near its point of use.
- Shine: clean, and inspect while cleaning, so leaks, loose fasteners, worn belts and damaged guards are found early.
- Standardize: post the rules where the work is done.
- Sustain: regular scored audits and leaders who walk the area and act; a deep clean right before an audit is a display, not a system.
Visual management shows the normal condition and any deviation at a glance. A shadow board with painted tool outlines shows instantly that a tool is missing.
An andon does the same for problems: an operator who finds a defect he cannot fix at his station pulls the andon and stops the line so help comes to him, instead of passing the part downstream or quietly setting it aside.
Example: a team sorts a cluttered bench and finds three broken gauges and a box of obsolete fixtures. Removing those first means the shadow board they build next holds only tools the job actually uses.
Check yourself
1. A team is starting 5S in its work area. Which step comes first, and what does it do?
2. A cell installs a shadow board for its hand tools. What does this visual control accomplish?