Standard work records the current best-known sequence, method and time for a job. It has to exist before improvement, because without it every operator works a little differently and a measured gain could come from that variation instead of the change. It is not frozen: a proven improvement becomes the new standard.
Kaizen means many small, frequent improvements made by the people doing the work, often in short team events, rather than occasional large engineering projects. Teams run each change through plan-do-check-act.
Plan the countermeasure, Do it as a small trial, Check the results against the baseline data taken before, and only then Act by writing it into standard work and spreading it. Example: a team moves a gauge closer and times the job for one shift; if the times beat the old baseline, Act makes the new location standard.
Communication is part of the system. An operator who makes a temporary adjustment to hold a drifting dimension tells the incoming operator at handover and records it in the shift log, so the cause gets found instead of each shift quietly adjusting around it.
Check yourself
1. A team ran a trial countermeasure on one shift. In plan-do-check-act, what does the Check step require?
2. Why must standard work exist before a process can be improved?