Chapters0/29 ▾
Chapter 5 · Lesson 1 of 5
Value-added, non-value-added and necessary work
1 min read
Lean defines value from the customer's point of view. A step adds value only when it physically transforms the material, or the information, toward what the customer ordered, so the customer would be willing to pay for it. Being on the routing sheet, being done by a skilled operator, or keeping a machine busy does not make a step value-added.
A busy machine making parts nobody ordered is overproduction.
| Category | Example in a machining cell | Lean response |
|---|---|---|
| Value-added | Drilling a hole the print calls for | Keep it and do it right the first time |
| Non-value-added but necessary | Testing the guard interlock before a run | Keep it; required safety checks are never cut |
| Pure waste | Redrilling a hole that came out off-center | Remove it by fixing the cause |
Inspection, moving and counting are non-value-added: they use labor and time but do not change the product. Inspection is often needed under the current process, yet the customer does not pay extra for it, so lean tries to design it out through error-proofing.
A finishing step the drawing calls out, such as deburring a specified edge, is value-added because the customer asked for it.
Check yourself
1. Which activity is best described as non-value-added but currently necessary?
2. An operator polishes a surface to a finer finish than the drawing requires because it looks better. Which waste is this?
Facts checked 2026-11-15 · Sources: MSSC: Certified Production Technician (CPT 4.0)
Production Technician cheat sheet: every key fact on one page →