Quibank app: now on the App Store — free, works offline. Get the app ↗

Chapters0/29 ▾
  1. 1.Safety0/4
    1. Lockout, tagout and stored electrical energy
    2. Refrigerant, cylinders and pressure hazards
    3. Carbon monoxide and combustion hazards
    4. PPE, brazing and job-site hazards
  2. 2.Tools & Measurement0/5
    1. Measuring temperature and proving the thermometer
    2. Humidity, wet bulb and dew point
    3. Gauge pressure, absolute pressure and vacuum
    4. Using electrical meters correctly
    5. Airflow, leak detection and charging tools
  3. 3.Basic Electrical0/4
    1. Ohm's law, power and power factor
    2. Series, parallel and reading a ladder diagram
    3. Transformers, single-phase and three-phase power
    4. Single-phase motors, capacitors and winding tests
  4. 4.Science & Refrigeration Cycle0/4
    1. Heat, sensible and latent heat, and heat transfer
    2. Saturation and the four main components
    3. Calculating superheat and subcooling
    4. Metering devices and reading the charge
  5. 5.Construction, Comfort & Airflow0/4
    1. The building envelope: insulation, air sealing and windows
    2. Loads, equipment sizing and comfort
    3. Airflow, static pressure and capacity
    4. Duct leakage, noise, filters and ventilation
  6. 6.AC Components & Operation0/4
    1. Compressors and keeping liquid out
    2. Outdoor coil, indoor coil and condensate
    3. Metering devices, the TXV bulb and charging method
    4. Line sets, accessories, service valves and thermostats
  7. 7.AC Diagnosis & Service0/4
    1. Reading superheat and subcooling patterns
    2. Troubleshooting the control circuit
    3. Compressor electrical faults
    4. Airside, static pressure and condensate problems
Saved in this browser. Move it to another device →
← Safety

Chapter 1 · Lesson 1 of 4

Lockout, tagout and stored electrical energy

1 min read

Lockout and tagout keep equipment from being energized while someone is working on it. The disconnect is opened, a lock and tag are applied, and then the circuit is tested.

Testing is required because a disconnect can be mislabeled, a unit can be fed from a second source, and a meter can fail. The live-dead-live method handles the last risk: prove the meter on a known live source, show the target circuit is dead, then prove the meter again.

  • When several technicians work on one unit, each applies a personal lock, because only that person knows when he or she is clear.
  • A tag only warns; it does not physically stop anyone from closing the switch.
  • Capacitors hold a charge after power is off, so discharge them through a resistor, never with a screwdriver short.
  • A stopped fan is not a de-energized fan: head-pressure controls, defrost boards and time delays can start it at any moment.

Example: a technician finds a condenser fan idle with the thermostat satisfied and wants to check the blade. Turning the thermostat off is not enough. The correct sequence is open the disconnect, lock and tag it, prove the circuit dead, then discharge the capacitor before touching anything.

Check yourself

1. Three technicians are servicing the same air handler. How should locks be applied at the disconnect?

2. The thermostat is satisfied and the condenser fan is not turning. A technician wants to reach into the unit to check the fan blade. What should he do?

Facts checked 2026-11-15 · Sources: NATE: Certification exams, OSHA 29 CFR 1910.147: The control of hazardous energy (lockout/tagout)

NATE HVAC cheat sheet: every key fact on one page →