Chapter 1
Load Charts & Capacity
Key takeaways
- Chart ratings are gross, so every load-handling device hanging on the crane, used or not, is subtracted to get net capacity. → Gross capacity, deductions and net capacity
- Never average or interpolate chart values; follow the chart note, which always points to the more conservative row or column. → Reading between chart rows and what the lines mean
- The measured loaded radius governs capacity, and it grows as the boom deflects under load. → Load radius, deflection and the configuration the chart assumes
- A chart is valid only for the exact configuration it names: outrigger position, counterweight, boom mode and attachments. → Load radius, deflection and the configuration the chart assumes
- Chart capacity and rope capacity are separate limits, and the smaller one always controls. → Parts of line, rope limits and duty-cycle work
Common trap
- The most common wrong answers leave one device out: the overhaul ball that is not in use, the main block left reeved during an extension lift, or the stowed figure used for an erected extension. Another trap computes percent of capacity against the gross rating. Subtract everything that hangs on the crane, then divide by net. → Gross capacity, deductions and net capacity
- Distractors often average two radius readings, trust the angle indicator over the tape, or 'fix' a mismatched configuration with arithmetic, such as subtracting the missing counterweight. No calculation converts one configuration's rating into another's. → Load radius, deflection and the configuration the chart assumes
Chapter 2
Rigging & Load Handling
Key takeaways
- Sling angle is measured from the horizontal, and leg tension rises steeply as that angle gets smaller. → Sling angles and leg tension
- A choker is rated at roughly 75 to 80 percent of vertical, while a vertical-leg basket is rated at twice vertical. → Vertical, choker and basket hitches
- Load weight is verified from papers, markings, drawings or calculation, and if it cannot be confirmed the lift does not happen. → Load weight and center of gravity
- The pick point closer to the center of gravity carries the larger share of the weight. → Load weight and center of gravity
- A sling with a missing tag, a birdcage, a kink or a cut is removed from service, never derated in the field. → Hardware, sling inspection and taglines
Common trap
- Adding the two sling ratings together and comparing the sum with the load weight is the reasoning that overloads rigging. A flat angle can push one leg past its rating even when the load is far lighter than the combined ratings, so always check each leg on its own. → Sling angles and leg tension
- Wrong answers on hardware and inspection usually offer a way to keep working: use the damaged sling at half its rating, swap in a bolt for a lost shackle pin, work a kink out, or estimate a missing rating from the rope diameter. The rule is simpler. If the item is damaged or unidentified, it does not lift. → Hardware, sling inspection and taglines
Quick reference
| Sling angle from horizontal | Load angle factor | Meaning |
|---|---|---|
| 90 degrees (vertical) | 1.000 | Each leg carries only its share |
| 60 degrees | 1.155 | About 16 percent more tension |
| 45 degrees | 1.414 | About 41 percent more tension |
| 30 degrees | 2.000 | Each leg carries the whole load weight |
Chapter 3
Site Assessment & Setup
Key takeaways
- The crane may not be assembled or used unless the ground is firm, drained and graded so that, with mats or blocking, the manufacturer's support and level requirements are met. → Ground conditions and ground bearing pressure
- Ground bearing pressure equals the imposed load divided by the contact area, so a bigger mat lowers the pressure in direct proportion. → Ground conditions and ground bearing pressure
- Outriggers are fully extended or at a manufacturer-approved intermediate position with its own chart, with floats attached and the tires off the ground. → Outriggers, floats, blocking and level
- Near power lines, assembly and operation use 20 feet unless the voltage is known, and travel with no load uses its own smaller table. → Power line clearance during assembly, operation and travel
- No one goes into the swing area out of the operator's view until the operator has been told, and rotation waits until the worker is safe. → Assembly, disassembly and the swing area
Common trap
- The exam mixes the three clearance regimes on purpose. A 10 ft operating figure offered for travel, or the 20 ft blanket offered when the voltage is already known, are the usual distractors. Match the activity first, then the voltage. → Power line clearance during assembly, operation and travel
Quick reference
| Situation | Minimum clearance |
|---|---|
| Assembly or operation, voltage not determined | 20 ft |
| Operation, utility confirms up to 50 kV (Table A) | 10 ft |
| Travel with no load and boom lowered, over 0.75 kV up to 50 kV (Table T) | 6 ft |
Chapter 4
Signals & Communication
Key takeaways
- Stop uses one arm swung back and forth palm down, emergency stop uses both arms, and dog everything is both hands together at the waist. → Stop, emergency stop and dog everything
- Anyone may give a stop or emergency stop signal, and the operator must obey it. → Stop, emergency stop and dog everything
- A voice signal series is function and direction, then distance or speed, then function stop, with every direction given from the operator's point of view. → Voice, radio and horn signals
- If communication is lost or a signal is unclear, the operator stops and makes no response until a clear signal is given. → Voice, radio and horn signals
- Only one person signals at a time, and only third-party qualification documentation follows a signal person to a new employer. → When a signal person is needed and who has authority
Common trap
- Reading the raised fist as the track that moves, or reading the thumb as the load direction, are the two classic reversals. In both cases the answer that feels natural steers the machine the wrong way. → Hand signals for boom, load, swing and travel
- Direction questions often offer the signal person's right as the answer when she faces the crane. That mirror-image reading is exactly what the operator-perspective rule removes. Likewise, a radio that was tested back at the shop, or any open channel, does not meet the on-site testing and dedicated-channel requirements. → Voice, radio and horn signals
- A tempting distractor says the signal person directs the lift and carries the responsibility, so the operator should follow the signal. The operator keeps both the authority and the duty to stop and refuse an unsafe move, and work resumes only when the operator and the signal person agree the concern is resolved. → When a signal person is needed and who has authority
Quick reference
| Signal | How it is given | What it means |
|---|---|---|
| Stop | One arm extended to the side, palm down, swung back and forth | End the function that is moving |
| Emergency stop | Both arms extended, palms down, swung back and forth | Halt all crane motion at once |
| Dog everything | Both hands clasped together at waist level | Suspend operations and hold everything as it is |
Chapter 5
Operations & Operational Aids
Key takeaways
- An operational aid supplements the operator's own check of weight, radius and the load chart; it never replaces them. → Operational aids: categories, deadlines and temporary measures
- Category I aids are repaired within 7 calendar days and Category II aids within 30, with temporary alternative measures in place meanwhile. → Operational aids: categories, deadlines and temporary measures
- Telescoping out or booming down can two-block the hook even when the hoist drum is not turning. → Two-blocking and the anti two-block system
- Chart ratings are static, so abrupt starts, stops and fast swings add force and radius the chart does not cover. → Dynamic loading, swing control and side loading
- When hoisting personnel, the total load is held to 50 percent of rated capacity, free fall is prohibited, and an automatic anti two-block prevention device is required. → Personnel lifts, tandem lifts, wind and shutting down
Common trap
- Wrong answers keep the motion going: extend slowly while watching, raise engine speed to finish quickly, or swing away first. Adding or continuing any function while the block approaches the tip keeps closing the gap. → Two-blocking and the anti two-block system
- The 20 mph figure belongs only to hoisting personnel on a platform, and even there it triggers a qualified person's decision rather than an automatic stop. Answers that apply it, or a 30 mph figure, to every crane lift are wrong, because the allowable wind for ordinary work depends on boom length, attachments and the load's sail area and is set by the manufacturer. → Personnel lifts, tandem lifts, wind and shutting down
Quick reference
| Aid | Category and deadline | Temporary measure |
|---|---|---|
| Anti two-block device | I, 7 calendar days | Mark the cable; on a telescopic boom, also use a spotter when extending |
| Load moment indicator or load weighing device | II, 30 calendar days | Determine the load weight and give it to the operator before the lift |
| Boom angle or radius indicator | II, 30 calendar days | Physically measure the radius or angle |
| Hoist drum rotation indicator | II, 30 calendar days | Mark the drum so rotation is visible |
Chapter 6
Inspections & Safety Requirements
Key takeaways
- Shift and monthly inspections are done by a competent person, the annual by a qualified person, and only the monthly (3 months) and annual (12 months) must be documented. → Crane inspections: who, when and what gets written down
- Running rope comes off at 6 random broken wires in one lay or 3 in one strand in one lay, or when diameter drops more than 5 percent below nominal. → Wire rope removal from service
- A rope that has contacted an energized power line is replaced and may not be repaired. → Wire rope removal from service
- Safety devices such as boom stops and the level indicator have no repair window: if one is not working, operations do not begin. → Safety devices, tagged equipment and cab documents
- Certification is not authorization; the employer must still evaluate the operator on the specific machine. → Stop authority, swing areas and operator authorization
Common trap
- Two swaps catch most candidates: the 3-month and 12-month retention periods reversed, and the 30-day repair window, which belongs only to Category II operational aids, applied to a mechanical defect found during an inspection. A hazardous deficiency takes the crane out of service now. → Crane inspections: who, when and what gets written down
- Mixing up the three sets of broken-wire criteria is the most-missed item here. The 2-in-6-diameters figure belongs to rotation-resistant rope, and the end-connection figure belongs to standing rope. A question about running rope wants 6 per lay or 3 in one strand. → Wire rope removal from service
Quick reference
| Inspection | Done by | Record required by the rule |
|---|---|---|
| Each shift | Competent person | None |
| Monthly | Competent person | Kept at least 3 months |
| Annual/comprehensive | Qualified person | Kept at least 12 months |