Power line clearance during assembly, operation and travel

1 min read

Before assembly or work near power lines, the employer identifies the work zone and picks one option: have the utility confirm the line is deenergized and visibly grounded at the site, keep the blanket 20 ft clearance, or get the voltage from the utility and use the clearance table.

Under the clearance options, encroachment-prevention measures are also required, such as a dedicated spotter, a proximity alarm or a range limiter, along with nonconductive tag lines. A guess that a line looks dead is never a substitute, and an insulating link does not count as a measure during assembly; during operations it is only one listed option among several.

SituationMinimum clearance
Assembly or operation, voltage not determined20 ft
Operation, utility confirms up to 50 kV (Table A)10 ft
Travel with no load and boom lowered, over 0.75 kV up to 50 kV (Table T)6 ft

Example: a 13.8 kV line is under 50 kV, so operating to the table needs 10 ft, and traveling under it with no load needs 6 ft. If any part of a traveling crane will come within 20 ft of a line, a dedicated spotter stays in continuous contact with the driver.

If the boom does touch a line, the operator stays in the cab, moves clear only if it is safe, and keeps everyone away from the crane, load and rigging.

Check yourself

1. A crane will operate near an energized 13.8 kV distribution line. The employer has not deenergized the line and, after confirming the voltage with the utility, elects to work to the clearance table in the standard. What minimum clearance applies during operation?

2. A crew must assemble a lattice boom within reach of an overhead transmission line. Which of the following satisfies the standard before assembly begins?