Roof framing: rafters, ridges and trusses
1 min read
Rafters that meet at a ridge board act as a triangle whose base must be held together. The ridge board is only a nailing surface and carries no vertical load, so rafter ties low in the span take the outward thrust in tension.
Remove those ties and the rafter feet push the walls outward at the top while the ridge sags. A structural ridge beam is different: it carries roof load down posts to bearing, so the walls see no outward thrust. Collar ties sit high, near the ridge, and resist uplift and ridge separation, not thrust.
An engineered truss works because every chord and web carries a designed tension or compression force. A web cut for a duct is a significant structural defect, and the inspector refers it to an engineer or the truss designer rather than computing remaining capacity or prescribing a field repair.
Truss uplift is the opposite kind of finding: in winter the cold, damp top chord and warm, dry bottom chord change moisture differently, the bottom chord bows up, and a gap opens between ceiling and partitions, closing again in summer.
It is seasonal, reversible and cosmetic. On the exam, the word seasonal is the clue that separates uplift from settlement or a failed member.
Check yourself
1. In a house with conventionally framed rafters and a ridge board, the ties that spanned across the lower portion of the rafter span were removed during an attic conversion. The inspector now finds the exterior walls leaning outward at the top and the ridge line sagging. Why did this happen?
2. A homeowner reports that a horizontal gap opens between the ceiling and the interior partition walls each winter and closes again in summer. The roof is framed with engineered trusses. What is the most likely explanation?