1. A leasing consultant walks a prospect past litter on the sidewalk and later tells the maintenance supervisor she left it because grounds cleanup belongs to maintenance. What does the CAMT approach to curb appeal say?
- A.Maintaining curb appeal is every employee's job, all day long✓ Answer
- B.Curb appeal is the leasing team's concern only during tours
- C.Curb appeal work belongs only to the grounds crew and technicians
- D.The scheduled morning walk is when curb appeal gets addressed
Curb appeal is taught as a shared responsibility of every employee, not a task assigned to one department or one time of day. Trash is picked up every time anyone sees it, because the first impression a prospect or a current resident forms drives both new leases and renewals.
Ref QB-TDYGFGSource: NAAEI CAMT curriculum, Facilities Operations — curb appeal and daily inspectionsReport a problem with this question
2. A maintenance supervisor fills out the building exterior checklist during a property inspection. Beyond listing the defects found, what is that checklist meant to accomplish?
- A.Rank vendors by how quickly they returned bids on exterior work
- B.Document resident damage so the charges reach the correct ledger
- C.Record the conditions so repairs can be scheduled, re-checked and budgeted✓ Answer
- D.Demonstrate to the insurance carrier that the coverage terms were met
The exterior checklist is a planning document, not just a defect list: it captures current conditions, drives the scheduling of repairs, supports a re-inspection once the work is done, and feeds the budget for capitalized repairs to the asset. That is why the same form is used again after the repair.
Ref QB-9WEZPESource: NAAEI CAMT curriculum, Building Exterior ChecklistReport a problem with this question
3. During a common-area walk a technician finds that the self-latching pool gate no longer catches when it swings shut. What is the correct response?
- A.Close the pool area and report the failed latch✓ Answer
- B.Add the latch to the next monthly common-area walk list
- C.Post a sign asking residents to pull the gate closed
- D.Prop the gate shut until the new hardware arrives
A gate that no longer latches leaves the pool open to unsupervised entry, so the hazard has to be removed before anything else: the area is secured and the failure is reported for repair. A sign, a prop or a place on next month's list all leave the unsafe access in place while people keep using the area.
Ref QB-SDM6AFSource: NAAEI CAMT curriculum, recreational facilities and common areas — gates and entry controlReport a problem with this question
4. A new technician asks why the community enforces so many rules, signs and safety devices around the pool. Which answer states the purpose correctly?
- A.To reduce the volume of chemicals the pool consumes each season
- B.To limit the hours an attendant must be on duty at the poolside
- C.To lower the yearly premium the community pays to its insurer
- D.To prevent accidents and to comply with local, state and federal rules✓ Answer
Aquatic safety measures serve two purposes at once: they protect people from drowning and injury, and they satisfy the local, state and federal requirements that govern pools and spas. Treating them as merely a cost or insurance matter misses the legal obligation that stands behind them.
Ref QB-8W3PHDSource: NAAEI CAMT curriculum, pool and spa safety measuresReport a problem with this question
5. While replacing a faucet cartridge, a technician notices that the home's balcony guardrail is loose. The work order says nothing about the balcony. What should the technician do?
- A.Log it for the next scheduled exterior building walk
- B.Ask the resident to submit a separate service request
- C.Mention it to the resident and finish the faucet work
- D.Report the guardrail to the manager and document it✓ Answer
An unsafe or reportable condition discovered inside a home goes to the manager, whether or not it appears on the work order. Pushing the report back onto the resident, or holding it for a future walk, leaves a fall hazard in service and leaves the community without a record that anyone knew about it.
Ref QB-RD9U4ESource: NAAEI CAMT curriculum, reporting unsafe or reportable conditionsReport a problem with this question
6. An owner asks why the community pays for scheduled service on equipment that is still running fine. What is the strongest justification?
- A.Scheduled service removes the need to stock repair parts
- B.Scheduled service extends equipment life and prevents emergencies✓ Answer
- C.Scheduled service shifts equipment repair costs onto the residents
- D.Scheduled service lets major replacements be deferred forever
The stated goal of a preventive maintenance program is to keep equipment functioning and to lengthen its service life while minimizing downtime and emergencies. Run-to-failure costs more overall because a breakdown arrives at the worst moment, at overtime rates, with a resident already inconvenienced.
Ref QB-7WQBCCSource: NAAEI CAMT curriculum, preventive maintenance program goalsReport a problem with this question
7. A maintenance supervisor is deciding which tasks belong on next year's preventive maintenance calendar and how often each one is performed. Which set of inputs should shape that calendar?
- A.Manufacturer guidance, applicable codes, budget and owner goals✓ Answer
- B.The community's age, its home count and its current occupancy
- C.Last season's service request counts and the on-call rotation
- D.Resident survey scores, staff seniority and vendor availability windows
Preventive maintenance tasks are sorted into routine, seasonal and annual work, and what goes on the calendar is driven by the manufacturer's service guidance, the codes and regulations that apply, the approved budget, and the owner's goals for the asset. Staff convenience and last year's complaint volume are not the drivers.
Ref QB-QDWGXCSource: NAAEI CAMT curriculum, preventive maintenance planning inputsReport a problem with this question
8. A home is being made ready after a move-out. Which step in the turn protects key control for the incoming resident?
- A.Filing the previous resident's keys in the office box
- B.Re-keying the locks before the new resident moves in✓ Answer
- C.Issuing a building master key to the new resident
- D.Leaving the vacant lock on the door after move-in day
Re-keying during the make-ready is what guarantees that no one outside the office holds a working key to that home when the new resident takes possession. Keeping the old keys on file does nothing, because copies may exist, and the keyed-alike vacant lock is meant to come off before occupancy.
Ref QB-6WCZ6BSource: NAAEI CAMT curriculum, make-ready process and key controlReport a problem with this question
9. A dishwasher in an occupied home has failed. The repair part costs far less than a new machine but is two weeks out, while a replacement can be installed today. What should decide the call?
- A.The choice that keeps this month's expense line unchanged
- B.Whichever option avoids scheduling an outside vendor
- C.The resident's immediate need weighed against the money saved✓ Answer
- D.The lower invoice total, because saving money always wins
Repair-versus-replace decisions weigh parts, labor and scheduling against the life expectancy of the item and the immediate needs of the resident. The purpose is to maximize net operating income over time, and two weeks without a working appliance costs goodwill and renewals that can exceed the money the cheaper part saves.
Ref QB-PDJ6SBSource: NAAEI CAMT curriculum, repair-versus-replace decision factorsReport a problem with this question
10. A rooftop unit has failed three times this season. Parts are still available and each repair has been inexpensive. Which consideration most supports replacing the unit instead?
- A.The technician's preference for working on new units
- B.The smaller number of labor hours a swap-out takes
- C.The warranty that comes with a new piece of equipment
- D.Its repeat failure record against its remaining useful life✓ Answer
Life-cycle thinking compares the accumulating cost and disruption of repeated failures against how much useful life the equipment has left. When a unit near the end of its life fails again and again, each cheap repair buys shrinking reliability, and the total cost including resident disruption favors replacement.
Ref QB-AFHGNUSource: NAAEI CAMT curriculum, repair or replace — life expectancy and reliabilityReport a problem with this question
11. It is mid-morning. Three homes must be made ready by Friday, two service requests came in yesterday, and a resident calls to say water is pouring through a ceiling. What comes first?
- A.The make-ready homes, since Friday is a hard deadline
- B.The request from whoever called the office first
- C.The older of the two requests entered yesterday
- D.The ceiling leak, because flooding is an emergency✓ Answer
An unexpected emergency takes precedence over make-ready lists, outstanding service requests and long-term projects. Active flooding threatens habitability and spreads damage every minute it continues, which is why the field shorthand for emergencies is fire, flood and blood.
Ref QB-SXBB3USource: NAAEI CAMT curriculum, prioritizing service requests and emergenciesReport a problem with this question
12. Two routine service requests remain. One is from a resident who phones the office every day; the other was entered three days earlier by a resident who has never called. Which is worked first?
- A.The one from the resident who follows up every day
- B.The one the leasing team thinks will be quicker to fix
- C.The one entered first, no matter who submitted it✓ Answer
- D.The one in the building closest to where you are now
Among ordinary requests the oldest outstanding one is answered first. Letting the order depend on who complains loudest, who is friendliest or who the staff likes means residents are not being treated equally, and unequal service is exactly the pattern a fair housing complaint is built on.
Ref QB-BFVTTVSource: NAAEI CAMT curriculum, service request priority orderReport a problem with this question
13. A service request shows the permission-to-enter box left blank. The technician knocks at the scheduled time and no one answers. What is the correct action?
- A.Leave without entering and have the office call the resident✓ Answer
- B.Ask a neighbor whether the resident is away at work
- C.Enter anyway, because the work order itself authorizes access
- D.Enter, do the work, and leave a note explaining the visit
The permission-to-enter box is the resident's own authorization, and a work order does not replace it. With the box blank there is no consent on file, so the technician withdraws and the office arranges access, which also protects the resident's privacy and the company against a complaint.
Ref QB-TXPN8VSource: NAAEI CAMT curriculum, service requests — permission to enterReport a problem with this question
14. A community keeps entry key logs, pool logs, light check logs and snow removal logs. What is the primary reason these records are maintained?
- A.They let the office bill residents for work performed
- B.They take the place of incident reports after an event
- C.They show what was and was not done if a claim arises✓ Answer
- D.They set the order in which service requests are worked
Maintenance logs exist to create a detailed record usable in the investigation of a claim or a lawsuit: they prove the work was performed, when, and by whom. They supplement incident reports and photographs rather than replacing them, and they are not a billing or scheduling tool.
Ref QB-8FTTASSource: NAAEI CAMT curriculum, maintenance documentation and required logsReport a problem with this question
15. Permission to enter is on file for an occupied home and the technician knocks at the door, but no one answers. How should the technician enter and move through the home?
- A.Knock, announce at the door, then move through in silence
- B.Knock three times, then enter announcing yourself throughout✓ Answer
- C.Knock once, call the office, and enter when told to go in
- D.Knock twice, wait a minute, then enter and work quietly
The taught entry procedure is to knock three times and then announce yourself continuously as you move through the entire apartment home, so that anyone inside who did not hear the knock is never startled by a stranger. Announcing only at the door leaves a resident in a back room unaware that someone has come in.
Ref QB-QXMNQRSource: NAAEI CAMT curriculum, entering an occupied apartment homeReport a problem with this question
16. The part needed to finish a repair is out of stock and the supplier cannot deliver until next week. The resident is standing there waiting for an answer. What should the technician say?
- A.Explain the delay and give a realistic time frame✓ Answer
- B.Tell the resident the supplier alone caused the delay
- C.Say nothing and let the office handle the follow-up
- D.Promise the repair will be done by tomorrow evening
When a repair cannot be completed, the technician explains the situation and sets an expectation that can actually be met. A promise made to end an awkward conversation becomes a broken promise a day later, which damages trust far more than the delay itself, and blaming a vendor in front of a resident is unprofessional.
Ref QB-9F66GTSource: NAAEI CAMT curriculum, customer service — setting expectationsReport a problem with this question
17. A technician answers a prospect's question in the parking lot. Which wording matches the terminology the industry expects staff to use?
- A.Tenants, apartment complex and rental unit
- B.Residents, community and apartment home✓ Answer
- C.Lessees, housing development and dwelling
- D.Occupants, rental property and living space
The industry deliberately uses residents, community and apartment home in place of tenants, complex and unit. The preferred words describe a place where people live rather than an asset being occupied, and consistent language from every employee, including maintenance, supports the impression that sells and renews leases.
Ref QB-RXYYVSSource: NAAEI CAMT curriculum, industry terminologyReport a problem with this question
18. A technician wants to raise a concern about how one home's repeated after-hours calls are being handled. What is the best way to bring it to the management team?
- A.In the breezeway between homes while finishing a route
- B.In person, so the request is clear and stays private✓ Answer
- C.By text message, so there is a written time stamp
- D.In the maintenance group chat, so everyone sees it
Property issues are almost always best discussed with the management team in person: it ensures both sides understand the request, it lowers the chance of a fair housing misstep, and it gives privacy if the conversation turns confidential. Group chats and open breezeways let residents be discussed where others can read or overhear.
Ref QB-6F46YPSource: NAAEI CAMT curriculum, communicating with the management teamReport a problem with this question
19. While finishing a work order, the resident asks the technician to also hang a set of heavy shelves in the bedroom. What should the technician do?
- A.Refuse and tell the resident it is never allowed
- B.Check with the management team before doing extra work✓ Answer
- C.Do it now, since the technician is already inside the home
- D.Do it and add the time to the current work order
Work requested on the spot that is not on the order has to be verified with management before it is performed. Management decides whether the task is company work, chargeable, or outside the technician's scope, and doing it first creates an undocumented job with no record of who authorized it if the shelves later fail.
Ref QB-NXWYCPSource: NAAEI CAMT curriculum, scope of work and additional resident requestsReport a problem with this question
20. A contractor finishing an exterior painting project hands the technician an invoice and says the work looks complete. The project checklists have not been signed. What should happen?
- A.Pay it from petty cash and file the receipt for later
- B.Hold the invoice until the checklists are signed off✓ Answer
- C.Sign the checklists so the contractor is not delayed
- D.Submit it now and note the punch list as still open
A contractor's bill is submitted for payment only after all checklists have been approved and signed. The signed checklist is the community's only leverage to get incomplete or defective work corrected, and it disappears the moment the invoice is paid on the strength of how the job looks.
Ref QB-Z8HZ3HSource: NAAEI CAMT curriculum, working with vendors and contractorsReport a problem with this question
21. A repair in a community building turns out to be far larger and more technical than anything the technician has been trained to do. What is the right decision?
- A.Copy the method from an online video posted by a tradesman
- B.Bring in a licensed contractor and check local rules✓ Answer
- C.Attempt it carefully and stop if something goes wrong
- D.Wait for a slow week when there is more time for it
A licensed professional is called when regulation requires it, when the technician lacks the training or is not comfortable with the work, or when the job is simply too large. Recognizing that boundary is part of the role, and the applicable requirements must be verified with the authority having jurisdiction rather than assumed.
Ref QB-HRP6PHSource: NAAEI CAMT curriculum, when to call a licensed professionalReport a problem with this question
22. A vacant home is being made ready for a new resident. Which order of trades best avoids rework?
- A.Paint, then repairs, then final clean, then carpet cleaning
- B.Repairs, then paint, then cleaning, then carpet cleaning✓ Answer
- C.Final clean, then paint, then repairs, then carpet cleaning
- D.Carpet cleaning, then repairs, then paint, then final clean
Repairs come first because patching, sanding and installing parts create dust and marks that paint will then cover. Paint comes before cleaning so drips, dust and overspray are cleaned up rather than left behind, and carpet cleaning goes last so no other trade tracks dirt onto freshly cleaned, still-damp carpet before the final inspection. Cleaning carpet first guarantees later work soils it again, and painting before repairs means repainting every patched area. Doing the final clean before paint and repairs means the home has to be cleaned again.
Ref QB-29VB9JSource: NAAEI CAMT Content Outline, Domain III (Facilities Operations) – make-ready/unit turn sequencing; standard apartment turn practiceReport a problem with this question
23. During a turn, the painter can start tomorrow, but the drywall patches still need sanding and a new countertop has not been installed. Why should painting wait?
- A.Paint must cure for a full week before any repair work can start
- B.Patching and installs leave marks and new surfaces that need paint✓ Answer
- C.Painters may not legally enter a unit with any open work orders
- D.Painting must be the last trade so the unit smells fresh at move-in
Sanding dust, scuffs from setting a countertop, and new patch or caulk surfaces all need primer and paint, so painting first means paying to repaint those areas. Paint does not need a week of cure before other trades can work, open work orders do not legally bar a painter from a unit, and cleaning, carpet care and the final inspection, not paint, are the last steps of a turn.
Ref QB-JR2HUJSource: NAAEI CAMT Content Outline, Domain III – make-ready sequencing (repairs before paint); standard apartment turn practiceReport a problem with this question
24. At the final walk of a make-ready, the supervisor finds a missing outlet cover, a sticking closet door and grease left in the oven. How should the punch list be used?
- A.List only the items a vendor caused and send the rest to the office
- B.Tell the team verbally and let the new resident report anything left
- C.Mark the unit ready, since the items are minor, and fix them after the move-in
- D.Write down each item, assign it, and re-inspect until every item is closed✓ Answer
A punch list turns the final walk into a closed loop: every deficiency is written down, assigned to a person, and re-inspected until it is complete, so the home is not released with defects. Relying on memory or on the incoming resident to report problems, releasing the unit with known items, or tracking only vendor-caused items all let deficiencies reach move-in and damage the resident's first impression.
Ref QB-X8TBRESource: NAAEI CAMT Content Outline, Domain III Task 1 – inspections and documenting deficiencies; make-ready punch-list practiceReport a problem with this question
25. A technician's monthly check of a hallway fire extinguisher finds it in place, the gauge in the operable range, the pin and seal intact, and no visible damage. What does this monthly visual check NOT replace?
- A.A quarterly refill of the agent no matter what the gauge shows
- B.A weekly test discharge to prove the agent still sprays out
- C.Annual maintenance by a certified fire-protection technician✓ Answer
- D.A monthly hydrostatic test of the cylinder done by the technician
The monthly inspection is only a quick visual check that the extinguisher is present, charged and undamaged; it does not replace the annual maintenance that a qualified fire-protection service performs and records on the tag. Extinguishers are never test-discharged on a schedule, recharging follows any use or a need found at inspection or annual maintenance rather than a fixed quarterly refill, and hydrostatic testing is a long-interval shop test, not a monthly technician task.
Ref QB-FRYGBFSource: NFPA 10, Standard for Portable Fire Extinguishers – monthly inspection vs. annual maintenance by certified personnelReport a problem with this question
26. On moving day, residents have wedged a stairwell fire door open so it will not close. What should the technician do?
- A.Leave the wedge, since fire doors only need to close during an alarm
- B.Leave the wedge but post a sign asking residents to close it at night
- C.Take off the closer arm so the door stays open without needing any wedge
- D.Pull the wedge, let the door self-close and latch, and tell the office✓ Answer
A fire door protects the exit stairway only when it closes and latches on its own, keeping smoke and fire out of the escape path, and a wedge defeats that at the moment a fire could start. Only a listed hold-open device that releases on alarm may hold such a door open, so a wedge, a removed closer arm, or a sign asking residents to shut it are all unacceptable; telling the office lets management remind residents and track repeat problems.
Ref QB-Y86PWFSource: NFPA 80 / International Fire Code fire door requirements – self-closing, self-latching, not obstructed or wedged openReport a problem with this question
27. Which fire and life-safety task belongs on every make-ready checklist before the new resident moves in?
- A.Paint over the sprinkler heads to match the freshly painted ceiling
- B.Disconnect the CO alarm if the home has only electric appliances
- C.Test each smoke and CO alarm and replace any unit that fails✓ Answer
- D.Pull the alarm batteries so the new resident can install fresh ones
Smoke and CO alarms must work on the first day of a new tenancy, so testing every unit at the turn and replacing any that fail is part of the make-ready, and it creates a dated record that the alarms worked at move-in. Paint on a sprinkler head can keep it from operating, so a painted head is generally replaced rather than cleaned, pulling batteries leaves the home unprotected, and an installed CO alarm should not be disabled because it may be required and still guards against CO from attached garages or neighboring units.
Ref QB-GRBUGGSource: NFPA 72 (smoke/CO alarm testing and replacement); NFPA 25 (painted sprinkler heads that may not operate are replaced); NAAEI CAMT Domain II Task 1 fire safetyReport a problem with this question
28. A spa test shows total chlorine at 3.0 ppm and free chlorine at 0.5 ppm. What does the gap between the two readings tell the technician?
- A.Most chlorine is combined, so little is free to sanitize the water✓ Answer
- B.Total and free chlorine are the same, so the higher reading is the real one
- C.The free reading is invalid unless the pH is first raised above 8.0
- D.The water is overchlorinated, so the chlorine feeder should be shut off
Free chlorine is the active sanitizer, and total chlorine minus free chlorine is combined chlorine (chloramines), chlorine already spent reacting with contaminants. Here 2.5 of the 3.0 ppm is combined, so the spa is poorly sanitized and needs its free chlorine raised, for example by superchlorination per policy, and it should be closed if free chlorine is below the required minimum. The reading is not overchlorination, the two values measure different things, and pH does not have to be raised above 8.0 to test.
Ref QB-59XBSNSource: CDC Model Aquatic Health Code (MAHC) 5.7.3 – free available chlorine and combined chlorineReport a problem with this question
29. A pool test shows pH 8.0, and the property's target range is 7.2 to 7.8. Which adjustment moves the pH back into range?
- A.Add baking soda (sodium bicarbonate) to bring the pH down
- B.Add an acid such as sodium bisulfate to bring the pH down✓ Answer
- C.Add soda ash (sodium carbonate) to bring the pH down
- D.Add calcium chloride to the water to bring the pH down
Acids such as sodium bisulfate or muriatic acid lower pH, so they bring an 8.0 reading back toward the stated 7.2 to 7.8 range; high pH weakens chlorine and promotes scale. Soda ash raises pH, baking soda raises total alkalinity and nudges pH up, and calcium chloride raises calcium hardness, so none of them lowers pH.
Ref QB-NR4HCPSource: CDC MAHC 5.7.3 (pH range) and standard pool water chemistry – acid lowers pH, sodium carbonate raises pHReport a problem with this question
30. A new technician asks what the total alkalinity reading on the pool test kit actually measures. Which answer is correct?
- A.The amount of chloramines that cause eye irritation and odor
- B.How much chlorine is free to kill germs in the water
- C.The water's buffering capacity, which resists swings in pH✓ Answer
- D.The amount of dissolved calcium that can form scale on surfaces
Total alkalinity measures the bicarbonate and carbonate buffers that absorb added acids and bases, so it controls how stable the pH is: low alkalinity lets pH bounce, while high alkalinity makes pH drift up and resist lowering. Chlorine available to kill germs is measured as free chlorine, dissolved calcium is calcium hardness, and chloramines are combined chlorine, each a separate test.
Ref QB-4BH6MMSource: Standard pool water chemistry (CDC MAHC Annex – total alkalinity as pH buffer)Report a problem with this question
31. When collecting a pool water sample for a test kit, where should the technician take it?
- A.About elbow deep, away from the return jets and skimmer✓ Answer
- B.Beside a return jet, where treated water enters the pool
- C.From the pump strainer basket after shutting the pump off
- D.At the surface, right in front of the skimmer opening
A sample taken about elbow deep and away from return jets and the skimmer represents the water swimmers are actually in. Surface water at the skimmer is skewed by debris and oils, water at a return jet has just been dosed by the chemical feeder, and water sitting in a stopped pump's strainer basket is not circulating pool water, so each gives a misleading reading.
Ref QB-KTBZZKSource: Standard pool water testing practice – test-kit sampling instructions (sample at elbow depth away from returns and skimmers)Report a problem with this question
32. A rectangular pool measures 30 ft long by 15 ft wide with an average depth of 4 ft. Using 7.5 gallons per cubic foot, about how many gallons does it hold?
- A.54,000 gallons
- B.3,375 gallons
- C.13,500 gallons✓ Answer
- D.1,800 gallons
Volume is length x width x average depth: 30 x 15 x 4 = 1,800 cubic feet, and 1,800 x 7.5 = 13,500 gallons. Stopping at 1,800 forgets to convert cubic feet to gallons, 3,375 comes from multiplying the surface area by 7.5 and skipping depth, and 54,000 multiplies by the depth a second time.
Ref QB-3B6UEKSource: Pool volume formula (L x W x average depth x 7.5 gal/ft³); NAAEI CAMT Domain III Task 2 pool mathReport a problem with this question
33. A product label calls for 1.5 lb per 10,000 gallons. The pool holds 20,000 gallons. Using 16 oz per pound, how many ounces by weight should be added?
- A.30 oz
- B.24 oz
- C.384 oz
- D.48 oz✓ Answer
The pool is 20,000 / 10,000 = 2 label units, so the dose is 2 x 1.5 = 3 lb, and 3 x 16 = 48 oz. The 24 oz answer converts the label rate but ignores the pool size, 30 oz treats a pound as 10 oz, and 384 oz wrongly uses the 128 fluid ounces per gallon volume conversion.
Ref QB-JTYNUJSource: Chemical dosing arithmetic from label rate; 16 oz per pound; NAAEI CAMT Domain III Task 2 unit conversionsReport a problem with this question
34. Four service requests arrive within minutes of each other. Which one should be handled first?
- A.A dishwasher that will not drain at all
- B.A resident who smells gas in the kitchen✓ Answer
- C.A resident who is locked out of the home
- D.A closet door that came off its track
A gas odor is a life-safety emergency because leaking gas can ignite or explode, so it is handled first under the emergency procedure: get people out, avoid switches and flames, and call the gas utility or 911 per policy. A lockout is urgent but not life-threatening, and a dishwasher that will not drain and an off-track closet door are routine requests.
Ref QB-2BTG9JSource: NAAEI CAMT Content Outline, Domain I Task 9 – work order priority (emergency vs. urgent vs. routine)Report a problem with this question
35. Overnight temperatures are forecast below freezing. A resident calls to report that the home has no heat at all. How should this request be classified?
- A.Routine, because heating calls are always worked in order received
- B.Emergency, because cold exposure threatens health and can freeze pipes✓ Answer
- C.Routine, because the resident can run the oven to warm the home
- D.Urgent, because it can wait for the first open slot the next business day
With freezing temperatures, a total loss of heat is an emergency: cold exposure endangers residents, especially young children, older adults and people who are ill, and unheated pipes can freeze and burst. Heating with an oven is a fire and carbon monoxide hazard, first-come order applies only among requests of the same priority, and pushing the call to the next business day ignores the overnight freeze.
Ref QB-HTMBPHSource: NAAEI CAMT Content Outline, Domain I Task 9 – prioritizing service requests by emergency/urgent/routineReport a problem with this question
36. A technician finishes repairing a leaking supply line under a kitchen sink. Which set of entries makes the work-order closeout complete?
- A.Only the technician's initials, since the office has the request
- B.Parts and their cost, leaving the repair description for the office
- C.The resident's attitude, how tidy the home looked, and total time on site
- D.What was found and done, parts, labor time, date, and any follow-up✓ Answer
A complete closeout records what was found, what was done, the parts used, the labor time, the date and any needed follow-up, so the office can bill, track the unit's history, spot repeat failures and prove the work was done. Comments on the resident's attitude or housekeeping are opinions that do not belong in maintenance records and can raise fair housing concerns, and initials or parts alone leave no usable record of the repair.
Ref QB-ZAF64HSource: NAAEI CAMT Content Outline, Domain I Task 9 and Domain II Task 5 – complete, objective work order documentationReport a problem with this question
37. A resident slips on a wet stair and is hurt, and the technician is first on the scene. Which entry belongs in the incident report?
- A.Found resident on the third step at 3:10 p.m. and photographed the wet step✓ Answer
- B.Stair was wet because the cleaning crew never does its job properly here
- C.Resident was probably not watching the steps and seemed a bit careless
- D.Resident seemed fine, so the report can wait until next week's meeting
An incident report should record objective, observable facts such as time, location, conditions, what was seen and what was done, supported by photos, and it should be completed promptly because it may support insurance, workers' comp or legal review. Guesses about the resident's carelessness and blame aimed at coworkers are opinions, not facts, and delaying the report until a later meeting loses details and breaks the timeliness rule.
Ref QB-GT9ZGGSource: NAAEI CAMT Content Outline, Domain II Task 5 – incident reports: objective, timely, with supporting documentationReport a problem with this question
38. During the morning pool check, a technician sees that the sand filter's pressure gauge reads well above its normal clean reading and the return jets are pushing only a weak flow. The water chemistry tested fine. What should the technician do?
- A.Add shock chlorine to clear the water and restore flow
- B.Replace all the filter sand before the pool reopens
- C.Backwash the filter to flush out the trapped debris✓ Answer
- D.Turn the pump up to a higher speed to push more water
As a sand filter traps debris, flow drops and back pressure rises, and a pressure gauge climbing toward its high mark is the standard signal that the filter needs a backwash, which reverses flow to flush the trapped material out to waste. Shock treats water chemistry, not a clogged filter; sand lasts years and is not replaced for routine loading; and speeding up the pump only fights the restriction harder.
Ref QB-8BXGASSource: Wikipedia, 'Swimming pool sanitation' — Filtration: sand filters are backwashed when a rising pressure gauge shows reduced flow and increased back pressure; supports CAMT Blueprint Domain III Task 2 (recreational facilities)Report a problem with this question
39. The storeroom is down to its last two HVAC filters, so the maintenance supervisor prepares a purchase order to restock them from the property's supplier. According to the CAMT study material, what does a purchase order specify?
- A.The item type, quantity and expected price from one vendor✓ Answer
- B.The technician's hours, overtime and the unit worked in
- C.The resident's name, unit and the date the request came in
- D.The part's warranty term, serial number and install date
A purchase order documents a buying transaction: what type of item is being bought, how many, and the price expected from a specific vendor, which also builds a record of the property's history with that vendor. Hours and overtime belong on a timesheet, resident and request details belong on the service request, and warranty or serial data belongs in equipment records.
Ref QB-QTRBQRSource: NAAEI CAMT Soft Skills Study Guide (naahq.org/node/163), Module 5: Documentation and Paperwork — purchase orders specify type, quantity and expected price from a specific vendorReport a problem with this question
40. The property manager is showing the maintenance team how Net Operating Income (NOI) is calculated. Which of these costs is NOT subtracted as an operating expense when arriving at NOI?
- A.Payroll for the onsite team
- B.Property taxes and insurance
- C.Landscaping and pest contracts
- D.Mortgage principal and interest✓ Answer
NOI is total operating income minus operating expenses, and operating expenses are the costs of running the property: payroll, taxes, insurance, maintenance and service contracts such as landscaping and pest control. Debt service, the mortgage's principal and interest, is a financing cost listed separately below NOI, which is why NOI can be used to value the property regardless of how it is financed.
Ref QB-DUEATASource: NAAEI CAMT Soft Skills Study Guide (naahq.org/node/163), Module 9: Money Matters — Operating Expenses, NOI definition, Debt ServiceReport a problem with this question
41. After a winter storm knocked out power at a sister property, a maintenance supervisor updates the community's emergency contact list. Which group of contacts does the CAMT material say the list should include?
- A.First responders, utilities and the company chain of command✓ Answer
- B.Each resident's cell phone, employer and next of kin
- C.Local news outlets, the leasing office and parts vendors
- D.Only 911, because responders will notify everyone else
In an emergency the team must reach outside help, the utility companies that can cut or restore gas, water and power, and its own company's chain of command, so all three belong on the list. Residents' personal details are private and are not an emergency-response tool, the media is not a responder, and 911 does not notify the utility or your managers for you.
Ref QB-WBMFDBSource: NAAEI CAMT Soft Skills Study Guide (naahq.org/node/163) — emergency contact list includes first responders, utility companies and your company's chain of command; emergency action plan sets roles, communication and evacuationReport a problem with this question
42. A technician arrives at a scheduled work order with permission to enter on file. After knocking, no one answers, and through the window he sees a large dog loose in the living room. What should he do?
- A.Enter, but keep the bedroom doors shut while working
- B.Enter once the dog has been moved onto the balcony
- C.Stay out and report back so the visit is rescheduled✓ Answer
- D.Enter, since the resident's permission is on file
Unsecured pets are one of the two standard reasons not to enter a scheduled home: if the resident is absent and the animal is not restrained, the technician does not go in. Permission to enter does not cover handling a resident's pet, and moving or confining the dog risks a bite, an escape and a liability claim, so the visit is reported and rescheduled.
Ref QB-CU3YM9Source: NAAEI CAMT Soft Skills Study Guide (naahq.org/node/163) — 'If the resident is not home and the animals are not restrained, don't go in'Report a problem with this question
43. A resident confronts a technician in the hallway, angry that her bathroom fan has failed again a week after it was 'fixed.' The technician wants to use the LAST model taught in CAMT for upset residents. What does LAST stand for?
- A.Log, Assess, Schedule, Track
- B.Listen, Apologize, Solve, Thank✓ Answer
- C.Listen, Agree, Settle, Transfer
- D.Learn, Advise, Support, Test
LAST stands for Listen, Apologize, Solve the problem, and Thank the resident for the opportunity to serve. Letting the resident be heard and acknowledging the inconvenience first lowers the tension, so the solution that follows is accepted; agreeing with every claim or handing the resident off does not resolve the complaint.
Ref QB-VB958ASource: NAAEI CAMT Soft Skills Study Guide (naahq.org/node/163) — 'Listen, Apologize, Solve the problem and say Thanks for the opportunity to serve (LAST)'Report a problem with this question
44. While fixing a sidewalk light, a technician is asked directions by a prospect touring with young children. Trying to be friendly, he suggests they would be happier in the back building 'where the other families live.' He had no wish to exclude anyone. How does fair housing law view his remark?
- A.It is legal, because the technician only meant to help
- B.Only leasing staff are bound, so maintenance is exempt
- C.Prospects are not protected until they become residents
- D.It may still be illegal, because intent is not required✓ Answer
Pointing a family with children toward a particular building because of familial status is steering, and the law applies regardless of intent, so a well-meant remark can still be a violation. Fair housing rules bind every employee, maintenance included, and protect prospects and visitors as well as current residents.
Ref QB-BUQMF8Source: NAAEI CAMT Soft Skills Study Guide (naahq.org/node/163), Module 8: Compliance — steering prohibited; 'The law applies regardless of your intent'; fair housing covers visitors and prospective residentsReport a problem with this question
Other topics in this exam
Practice questions based on the published NAAEI CAMT domains — Essential Trade Skills, Compliance, Facilities Operations, and Professional Development & Collaboration — and on standard trade practice. CAMT and NAAEI are marks of the National Apartment Association; this site is not affiliated with or endorsed by NAA or NAAEI. Code requirements, licensing boundaries and permit rules vary by jurisdiction and revise on a cycle, so none is tested here as a recalled figure — always verify the code having jurisdiction and use a licensed contractor where the work requires one. Confirm current program requirements with NAAEI before testing. About the CAMT credential →