28 Manufacturing Processes & Materials Practice Questions & Answers

Every Manufacturing Processes & Materials practice question from the Production Technician Practice Test, with the correct answer and a short explanation.

Start practice test →
  1. 1. A cast iron pump housing needs internal passages that would be very hard to machine. Which process forms the part by filling a mold with molten metal?

    • A.Surface grinding
    • B.Drop forging
    • C.Sheet metal stamping
    • D.Sand casting✓ Answer

    Casting fills a mold cavity with molten metal, and cores set inside the mold produce internal passages in a single step. Forging and stamping deform solid metal and cannot create closed internal cavities, and grinding only removes a thin surface layer.

    Ref QB-P24JY2Source: MSSC Certified Production Technician standards, Manufacturing Processes and Production content on production processes (casting)Report a problem with this question

  2. 2. A plant must produce millions of identical thermoplastic housings at a very low cost per piece. Which process best fits that requirement?

    • A.Machining each housing from bar stock
    • B.Hand layup of resin and fabric plies
    • C.Pouring the housings in sand molds
    • D.Injection molding in a steel mold✓ Answer

    Injection molding forces molten thermoplastic into a hardened mold and ejects a finished part in seconds, so the high tooling cost is spread over a very large volume. Machining and hand layup have low tooling cost but far too much labor per piece, and sand casting is a metal process.

    Ref QB-7J9QJ3Source: MSSC Certified Production Technician standards, molding processes for polymersReport a problem with this question

  3. 3. How does forging shape a metal part?

    • A.It fuses two pieces together at a heated joint
    • B.It cuts chips away until the finished size is reached
    • C.It melts the metal and pours it into a cavity
    • D.It presses solid metal into shape, removing none✓ Answer

    Forging is a bulk forming process: force from a hammer or press moves solid metal into the die shape, so almost no material is lost and the grain flow follows the part contour. Melting and pouring is casting, chip removal is machining, and fusing a joint is welding.

    Ref QB-Q2FV54Source: MSSC Certified Production Technician standards, forming and forging processesReport a problem with this question

  4. 4. On a lathe the operator doubles the feed rate and leaves every other setting the same. What happens to the machined surface?

    • A.The surface turns mirror bright
    • B.The surface becomes rougher✓ Answer
    • C.The surface becomes smoother
    • D.The surface finish is unchanged

    Feed is the distance the tool advances per revolution, so a larger feed leaves deeper, more widely spaced tool marks and a rougher finish. It also raises cutting force and heat, which shortens tool life, so a finishing pass is normally run at light feed.

    Ref QB-8JM2R4Source: Standard machining practice; MSSC Certified Production Technician standards, machining process parametersReport a problem with this question

  5. 5. A gearbox cover must be taken off for scheduled service and put back on afterward. Which joining method suits it?

    • A.Threaded bolts and lock nuts✓ Answer
    • B.Solid rivets driven in place
    • C.Fillet welds around the joint
    • D.Structural adhesive bonding

    Threaded fasteners make a non-permanent joint that can be loosened and retightened to a specified torque many times, which is what a serviceable cover needs. Welds, rivets and structural adhesive all create permanent joints that must be cut or destroyed to open.

    Ref QB-R2T7B5Source: MSSC Certified Production Technician standards, joining processes (welding, fastening and adhesive bonding)Report a problem with this question

  6. 6. What makes additive manufacturing different from machining a part from solid stock?

    • A.It squeezes molten plastic into a closed mold
    • B.It cuts material away with a rotating tool
    • C.It pours molten metal into a prepared mold
    • D.It builds the part by adding material in layers✓ Answer

    Additive manufacturing builds the part up layer by layer from a digital model, the opposite of subtractive machining, which starts oversize and removes chips. Because no die or mold is needed, it is well suited to prototypes, low volumes, tooling aids and shapes that cannot be cut.

    Ref QB-9JYCW5Source: MSSC Certified Production Technician standards, additive manufacturing conceptsReport a problem with this question

  7. 7. Cold working has left a steel bracket hard and likely to crack if it is bent any further. Which heat treatment softens it and relieves internal stress?

    • A.Flame hardening
    • B.Quench hardening
    • C.Full annealing✓ Answer
    • D.Case carburizing

    Annealing heats the steel and then cools it slowly, letting the deformed grain structure re-form so hardness drops, ductility returns and residual stress is relieved. The other three treatments are all intended to add hardness, which would make the cracking problem worse.

    Ref QB-S26JG6Source: MSSC Certified Production Technician standards, heat treating processesReport a problem with this question

  8. 8. A carbon steel frame will be used outdoors. Which finishing operation is applied mainly to protect it from corrosion?

    • A.Polishing the welds bright
    • B.Deburring the cut edges
    • C.Bead blasting the surface
    • D.Zinc coating the surface✓ Answer

    A zinc coating both seals moisture away from the steel and corrodes sacrificially in place of the iron, so bare spots and scratches stay protected. Blasting, deburring and polishing change the surface texture or remove sharp edges but leave the steel unprotected.

    Ref QB-AJBQ37Source: MSSC Certified Production Technician standards, finishing and coating processesReport a problem with this question

  9. 9. A planner is deciding between machining a bracket one at a time and building a stamping die for it. Which condition most favors building the die?

    • A.Only one prototype is needed next week
    • B.High volume spreads the tooling cost✓ Answer
    • C.The design still changes week to week
    • D.Fewer than ten parts will ever be built

    Tooling is a fixed cost paid once, so the cost per piece falls as the quantity rises and a die only pays off across a large run. A single prototype, a design still in flux, or a handful of parts all favor a flexible low-tooling route such as machining.

    Ref QB-T2HVN7Source: MSSC Certified Production Technician standards, relationship of process selection, volume and costReport a problem with this question

  10. 10. A magnet sticks firmly to a scrap piece in the metal bin. What does that tell the technician about the material?

    • A.It is a metal that will never rust
    • B.It is a ferrous metal containing iron✓ Answer
    • C.It is aluminum or another light alloy
    • D.It is a copper-based alloy such as brass

    Ferrous metals are iron based, and most of them are magnetic (austenitic stainless steel is a common exception) and prone to rust when moisture reaches bare surfaces. Aluminum, copper and brass are non-ferrous, contain no iron and are not attracted to a magnet, so the magnet test is a quick way to sort scrap.

    Ref QB-KP9RU3Source: MSSC Certified Production Technician standards, engineering materials (ferrous and non-ferrous metals)Report a problem with this question

  11. 11. Which material property allows a copper rod to be drawn out into thin wire without breaking?

    • A.Hardness
    • B.Ductility✓ Answer
    • C.Brittleness
    • D.Elasticity

    Ductility is the ability to undergo large permanent deformation in tension before fracture, which is exactly what wire drawing demands. Hardness is resistance to indentation, elasticity means the metal springs back to its original shape, and a brittle material would snap instead of stretching.

    Ref QB-374K93Source: MSSC Certified Production Technician standards, material propertiesReport a problem with this question

  12. 12. Trimmed scrap from a molding press is ground up, melted and molded again. Which material family behaves this way?

    • A.Thermoplastic resins✓ Answer
    • B.Cured thermoset resins
    • C.Fired ceramic parts
    • D.Vulcanized elastomers

    Thermoplastics soften every time they are reheated because their molecular chains are not cross-linked, so regrind can be remelted and molded again within limits. Thermosets, vulcanized rubber and fired ceramics are permanently cross-linked or fused and will char, tear or crack rather than melt.

    Ref QB-JPWDP2Source: MSSC Certified Production Technician standards, polymers (thermoplastics versus thermosets)Report a problem with this question

  13. 13. Which document moves with the job through the plant and lists, in order, the operations the part must go through?

    • A.The bill of material list
    • B.The packing slip in the box
    • C.The routing sheet or traveler✓ Answer
    • D.The invoice for the customer

    The routing sheet, often called the traveler, stays with the job and shows each operation in sequence along with the work centers and sign-offs, so anyone can see where the part is and what comes next. The bill of material only lists components and quantities, and the packing slip and invoice belong to shipping and billing.

    Ref QB-27R842Source: MSSC Certified Production Technician standards, production documents (routing sheet and traveler)Report a problem with this question

  14. 14. A cell has 420 minutes of available production time in a shift, and the customer needs 210 units per shift. What is the takt time?

    • A.2 minutes per unit✓ Answer
    • B.4 minutes per unit
    • C.210 minutes per unit
    • D.0.5 minute per unit

    Takt time is available production time divided by customer demand, so 420 minutes divided by 210 units equals 2 minutes per unit. It is the pace that demand sets, not a machine speed, and dividing demand by time instead gives 0.5, which is a rate in units per minute rather than a takt time.

    Ref QB-NPYD76Source: MSSC Certified Production Technician standards, production planning (takt time calculation)Report a problem with this question

  15. 15. Four stations on a line run in sequence with cycle times of 30, 45, 60 and 40 seconds. At best, how often can the line deliver a finished unit?

    • A.One unit every 60 seconds✓ Answer
    • B.One unit every 30 seconds
    • C.One unit every 44 seconds
    • D.One unit every 175 seconds

    The slowest operation is the bottleneck and it sets the output rate of the whole line, so nothing downstream can be finished faster than one unit every 60 seconds. The 175 seconds figure is the sum of all four stations, which is closer to the time one piece takes to travel the line, and 44 seconds is the average, which no station actually runs at.

    Ref QB-57T8M5Source: MSSC Certified Production Technician standards, workflow coordination (bottleneck and throughput)Report a problem with this question

  16. 16. In a pull system, what tells an upstream station to make more parts?

    • A.Free floor space at the machine
    • B.The monthly forecast from planning
    • C.A verbal order at the start of shift
    • D.A kanban signal from the next process✓ Answer

    In a pull system the downstream customer process authorizes replenishment with a kanban card, bin or electronic signal, so parts are made only after they are consumed. Building to a forecast or to whatever space is available is a push system, which piles up work in process that nobody has asked for yet.

    Ref QB-MPM325Source: MSSC Certified Production Technician standards, just-in-time and pull productionReport a problem with this question

  17. 17. A stockroom holds sealed adhesive cartridges that have a shelf life. How should they be issued to the floor?

    • A.Issue the oldest stock first✓ Answer
    • B.Issue the newest cartridges first
    • C.Issue the largest containers first
    • D.Issue whichever box is closest

    First-in, first-out rotation issues the oldest acceptable stock first so shelf-life material is consumed before its expiration date and none of it has to be scrapped. Picking the nearest or newest container leaves old material buried at the back of the rack until it expires.

    Ref QB-47FWE4Source: MSSC Certified Production Technician standards, inventory control and FIFO stock rotationReport a problem with this question

  18. 18. The material staged at a machine carries a different part number from the one printed on the work order. What should the operator do first?

    • A.Stop and tell the supervisor✓ Answer
    • B.Change the number on the order
    • C.Run the job and note it later
    • D.Swap in similar material nearby

    Material has to match the part number, material specification and revision called out on the work order before the job runs, so a mismatch is reported to the supervisor or planner and the discrepancy is resolved first. Substituting a look-alike or editing the paperwork can scrap the entire lot and destroys the traceability record.

    Ref QB-QPP3J8Source: MSSC Certified Production Technician standards, verifying resources against the work orderReport a problem with this question

  19. 19. Why does a long changeover between two products raise the cost of the parts that follow?

    • A.Tooling wears faster during setup than in a run
    • B.Setup labor is billed straight to the customer
    • C.Changeover minutes are reported as scrap units
    • D.The machine makes no parts while it is being changed✓ Answer

    Changeover consumes machine capacity without producing anything, and that lost time is spread across the parts made in the run that follows, so short runs carry the most setup cost per piece. This is why quick-changeover work moves as many setup steps as possible off-line, doing them while the machine is still running the previous job.

    Ref QB-77HWX7Source: MSSC Certified Production Technician standards, setup and changeover as production costReport a problem with this question

  20. 20. Every carton carries a lot number that is scanned at each operation. What does this practice mainly give the plant?

    • A.Proof that the order shipped on time
    • B.Traceability of the affected units✓ Answer
    • C.A guarantee the part meets the print
    • D.A substitute for the packing slip

    Lot coding plus a scan at each step links every unit to the raw material, machine and operators that produced it, so if a defect or a bad material lot appears later, exactly which units are involved can be identified and contained. Scanning records history, it does not verify dimensions or replace shipping paperwork.

    Ref QB-PR9WC7Source: MSSC Certified Production Technician standards, production reporting, labeling and lot traceabilityReport a problem with this question

  21. 21. How do augmented reality work instructions differ from virtual reality?

    • A.They print the instructions at the workstation
    • B.They run the machine with no operator present
    • C.They overlay information on the real workspace✓ Answer
    • D.They replace the workspace with a simulation

    Augmented reality adds a digital layer, such as the next step, an arrow or a part number, on top of what the technician actually sees through a headset or tablet, so hands and eyes stay on the real job. Virtual reality replaces the real view entirely, which suits off-line training but not live assembly or setup work.

    Ref QB-79F3Y7Source: MSSC Certified Production Technician standards, Industry 4.0 concepts (augmented reality)Report a problem with this question

  22. 22. Machines on a line send vibration and temperature readings to a plant dashboard in real time. What is the main shop-floor benefit?

    • A.Start-up checks in the manual can be skipped
    • B.Written maintenance records are no longer kept
    • C.A developing problem can be caught before failure✓ Answer
    • D.Machine guards can be opened while running

    Connected sensors report machine condition continuously, so a rising vibration or temperature trend is visible while the equipment still runs and the repair can be scheduled instead of becoming an unplanned breakdown. Collecting data does not remove the duty to keep records, follow the manufacturer's start-up procedure, or leave guards in place.

    Ref QB-NRWJ76Source: MSSC Certified Production Technician standards, Industry 4.0 concepts (industrial internet of things and production data analytics)Report a problem with this question

  23. 23. A 15-tooth driver gear on a motor shaft meshes with a 45-tooth driven gear. The motor turns at 1,200 rpm. What is the output shaft speed, and how does its torque compare with the input?

    • A.3,600 rpm, with about three times the input torque
    • B.400 rpm, with about one-third of the input torque
    • C.400 rpm, with about three times the input torque✓ Answer
    • D.3,600 rpm, with about one-third of the input torque

    The gear ratio is driven teeth divided by driver teeth: 45 / 15 = 3:1. The driven gear turns once for every three turns of the driver, so the output runs at 1,200 / 3 = 400 rpm. In a gear train the torque ratio equals the speed ratio, so (ignoring friction losses) the slower output shaft delivers about three times the input torque. Speed and torque trade off against each other; they never both go up or both go down.

    Ref QB-694RS6Source: Wikipedia, "Gear train": speed ratio from tooth counts and "Torque ratio analysis" (torque ratio equals the gear/speed ratio); MSSC CPT 4.0 Candidate Handbook v17.1, p. 19, "Define ways in which machines use pulley and gear drives"Report a problem with this question

  24. 24. A technician pulls on a wrench handle with 40 lb of force, applied at a right angle 18 inches from the center of the bolt. How much torque is applied to the bolt?

    • A.26.7 lb-ft
    • B.60.0 lb-ft✓ Answer
    • C.720 lb-ft
    • D.2.22 lb-ft

    Torque is force multiplied by the lever arm, the perpendicular distance from the pivot to the line of the force. Converting 18 inches to 1.5 feet gives 40 lb x 1.5 ft = 60 lb-ft. Writing 40 x 18 = 720 is correct only in lb-in, so labeling it lb-ft is a unit error, and dividing force by distance (26.7 or 2.22) inverts the formula.

    Ref QB-MRJ825Source: OpenStax University Physics Vol. 1, Sec. 10.6 "Torque" (magnitude of torque = lever arm x force); MSSC CPT 4.0 Candidate Handbook v17.1, p. 19, "Describe ways in which force and torque are used in machine operations"Report a problem with this question

  25. 25. After changing a CNC lathe over to a new part number, the operator machines the first part. What should happen before the full production run starts?

    • A.Run the full batch, then check a sample at the end
    • B.Start the run, because the setup sheet was followed
    • C.Check the first piece only if the last job had rejects
    • D.Check the first piece against the print specifications✓ Answer

    The setup is not proven until the first piece meets specification, so it must be inspected against the print before the run. Following the setup sheet does not catch a wrong tool offset, a worn insert or a material mix-up, and checking only at the end of the batch can turn one setup error into a whole lot of scrap. The check is needed on every changeover, not only after a bad job.

    Ref QB-59RDM5Source: MSSC CPT 4.0 Candidate Handbook v17.1, p. 20, Set up and verify equipment for the production process (12.5%): "Ensure first piece or production run meets specifications"Report a problem with this question

  26. 26. A truck driver arrives to pick up a pallet of finished parts. Which document does the carrier issue as the receipt for the freight, naming the shipper and consignee, the origin and destination, and the number of packages?

    • A.Bill of lading✓ Answer
    • B.Packing slip
    • C.Routing sheet
    • D.Shipping label

    Federal motor-carrier rules require the carrier to issue a receipt or bill of lading listing the consignor and consignee, origin and destination points, number of packages, description of the freight and, where it affects the rate, its weight. A packing slip only tells the receiver what is in the box, a routing sheet travels with the job inside the plant, and a shipping label marks a package but is not the carrier's receipt.

    Ref QB-KR7WU3Source: 49 CFR 373.101, "For-hire, non-exempt motor carrier bills of lading" (items a-e: consignor/consignee, origin/destination, number of packages, description, weight)Report a problem with this question

  27. 27. A vibration sensor on a pump motor streams readings to the plant's maintenance system. The bearing is replaced only when the readings trend toward a failure limit, not on a fixed calendar. Which maintenance strategy is this?

    • A.Preventive maintenance
    • B.Reactive maintenance
    • C.Predictive maintenance✓ Answer
    • D.Autonomous maintenance

    Predictive maintenance bases the need for work on the measured condition of the machine rather than on a preset schedule, which is exactly what trending sensor data allows. Preventive maintenance is time-based (every so many hours or months), reactive maintenance waits until the equipment breaks, and autonomous maintenance in TPM means operators doing routine cleaning and lubrication, not sensor-triggered repairs.

    Ref QB-49D3F4Source: U.S. DOE FEMP, Operations & Maintenance Best Practices Guide, Ch. 5 (Sec. 5.2 Reactive, 5.3 Preventive, 5.4 Predictive Maintenance: maintenance need based on actual machine condition rather than a preset schedule)Report a problem with this question

  28. 28. A plant wants a robot to hand parts directly to an assembler at an open bench with no fence around it. Which robot application fits, and what keeps the worker safe?

    • A.A non-collaborative robot behind an interlocked guard
    • B.A collaborative robot with power and force limiting✓ Answer
    • C.A collaborative robot running at its full rated speed
    • D.A non-collaborative robot with a flashing warning light

    Collaborative robot applications are the ones designed for direct interaction with workers; non-collaborative robots are kept apart from people by guarding, which rules out handing parts across an open bench. Power and force limiting (PFL) robots use speed, force and power limiting so contact forces stay within acceptable limits, which is why they run well below their full rated speed. A flashing light is only an awareness device and must be used with other safeguards.

    Ref QB-TRP83CSource: OSHA Technical Manual, Section IV, Chapter 4 "Industrial Robot Systems and Industrial Robot Applications", Part IV (Collaborative vs. Non-Collaborative applications; PFL robots: speed, force and power limiting; awareness devices used in conjunction with other safeguards)Report a problem with this question

Other topics in this exam

Practice questions based on the MSSC Production Standards and the published content of the Certified Production Technician modules, together with federal OSHA general-industry requirements and standard manufacturing practice. MSSC and CPT are marks of the Manufacturing Skills Standards Council; this site is not affiliated with or endorsed by MSSC. Questions here never depend on recalling a regulatory limit, a citation number or a machine specification — always follow your own facility's written programs and the manufacturer's documentation for the equipment you run, and confirm current requirements before testing. About the CPT certification →